OPTIR — Optimize right (product) starting geometry.
OPTIR
OPTIR causes the right (product) geometry to be optimized prior to building the initial chain in a CHAIN/CHN calculation.
none
CHN, CHECKCHN, FULLCHN, or CHAIN.
OPTILR, OPTIL.
Copyright © 1992-2013 Semichem, Inc. All rights reserved.